What preparations are needed before using the TNM 32AX metallographic mounting machine?

Before using the TNM-32AX metallographic mounting machine, several preparation tasks need to be completed.
Check whether the appearance of the equipment is damaged and whether the power cord connection is firm to ensure the equipment is in a safe and operational state.
Based on the sample and mounting requirements, select the appropriate mounting powder and prepare the corresponding mold; check the mold for wear, deformation, etc., and replace it in a timely manner if there are issues.
Calibrate the temperature and pressure sensors of the equipment to guarantee the accuracy of temperature and pressure control; professional calibration equipment can be used, operating according to the calibration methods in the equipment manual.
Clean the molds, work surface, and other parts of the equipment to remove residual mounting materials, debris, and dust, ensuring a clean mounting environment.
Connect the power, turn on the equipment, and perform preheating operations to heat the mold cavity to an appropriate temperature, preparing for the mounting work that is about to begin.

Kunshan Fuze Testing Equipment Co., Ltd. provides users with detailed equipment usage guides to instruct users on various preparations before use, ensuring the normal operation of the equipment and the smooth implementation of mounting work.

GO TOP